Opening
|
Network
|
Route
|
Type |
Length
|
Updated
|
| 19-07-1900 |
PARIS |
A
(Saint-Germain-en-Laye / Cergy|Le Haut / Poissy -
Châtelet|Les Halles - Boissy-Saint-Léger /
Marne-la-Vallée|Chessy) |
108.5 km |
15-08-2007 |
586.1 | 208.485 | 31.3 | 0.108
|
B
(Aéroport Charles de Gaulle 2-TGV / Mitry-Claye
- Châtelet|Les Halles - Robinson /
Saint-Rémy-lès-Chevreuse) |
79.7 km |
15-08-2007 |
| |
|
C
(Pontoise / Versailles-Rive Gauche /
Saint-Quentin-en-Yvelines - St-Michel|Notre Dame
- Massy-Palaiseau / Dourdan-la-Forêt /
Saint-Martin d´Étampes / Versailles Chantiers) |
185.6 km |
15-08-2007 |
| |
|
D
(Orly-la-Ville|Coye - Châtelet|Les Halles -
Melun / Malesherbes) |
160.0 km |
15-08-2007 |
| |
|
E
(Haussmann|St-Lazare - Chelle|Gournay / Tournan) |
52.3 km |
15-08-2007 |
| |
|
1 (La
Défense - Château de Vincennes) |
16.600 km |
01-11-2005 |
| |
|
2 (Porte
Dauphine - Nation) |
12.316 km |
01-11-2005 |
| |
|
3 (Pont
de Levallois|Bécon - Galleni) |
11.665 km |
01-11-2005 |
| |
|
3bis
(Porte des Lilas - Gambetta) |
1.289 km |
01-11-2005 |
| |
|
4 (Porte
de Clignancourt - Porte d´Orléans) |
10.559 km |
01-11-2005 |
| |
|
5
(Bobigny|Pablo Picasso - Place d´Italie) |
14.634 km |
01-11-2005 |
| |
|
6
(Charles de Gaulle|Étoile - Nation) |
13.665 km |
01-11-2005 |
| |
|
7 (Le
Courneuve|8 Mai 1945 - Villejuif|Louis Aragon /
Mairie d´Ivry) |
18.594 km |
01-11-2005 |
| |
|
7bis
(Louis Blanc - LOOP) |
3.066 km |
01-11-2005 |
| |
|
8 (Balard
- Créteil-Préfecture) |
22.057 km |
01-11-2005 |
| |
|
9 (Pont
de Sèvres - Mairie de Montreuil) |
19.562 km |
01-11-2005 |
| |
|
10
(Boulogne|Pont de St-Clud - Gare d´Austerlitz) |
11.712 km |
01-11-2005 |
| |
|
11
(Châtelet - Mairie des Lilas) |
6.286 km |
01-11-2005 |
| |
|
12 (Porte
de la Chapelle - Mairie d´Issy) |
13.888 km |
01-11-2005 |
| |
|
13
(Châtillon-Montrouge - Saint Denis|Université /
Asnières-Gennevilliers|Les Courtilles) |
24.380 km |
16-06-2008 |
| |
|
14 (Saint
Lazare - Olympiades) |
9.287 km |
01-07-2007 |
| |
|
T1
(Saint-Denis - Noisy-le-Sec) |
12.1 km |
15-08-2007 |
| |
|
T2 (La
Défente - Issy-Val de Seine) |
11.3 km |
01-11-2005 |
| |
|
T3 (Pont
du Garigliano - Porte d´Ivry) |
7.9 km |
15-08-2007 |
| |
|
Funiculaire de Montmatre |
0.108 km |
15-08-2007 |
 |
Paris Rail
Transit Network Map
Current version: June 2008
File format: GIF
File size: 190,771 bytes (2298 pixels x
2289 pixels)
<<
Low resolution sample preview (575 pixels
x 573 pixels)
|
|
|
| 01-03-1901 |
WUPPERTAL |
60 (Vohwinkel -
Oberbarmen Bf (Berliner Platz)) |
13.3 km |
10-04-2007 |
|
|
|
| 10-06-1901 |
BOSTON |
Blue Line (Bowdoin -
Wonderland) |
Full Metro |
9.56 km |
18-02-2006 |
60.5
| 23.7(1) km
|
Orange Line (Oak Grove -
Forest Hills) |
Full Metro |
17.96 km |
18-02-2006 |
| |
|
Red Line (Alewife -
Ashmont / Braintree) |
Full Metro |
32.98 km |
18-02-2006 |
| |
|
B (Gov´t Center - Boston
College) |
Light Rail |
10.41 km |
18-02-2007 |
| |
|
C (Gov´t Center - Cleveland
Circle) |
Light Rail |
8.29 km |
18-02-2007 |
| |
|
D (Lechmere - Riverside) |
Light Rail |
21.87 km |
18-02-2007 |
| |
|
E (Lechmere - Heath) |
Light Rail |
8.88 km |
18-02-2007 |
|
| 18-02-1902 |
BERLIN |
U1 (Uhlandstr. - Warschauer Str.) |
Full Metro |
8.851 km |
01-11-2005 |
144.96
|
U2 (Pankow - Ruhleben) |
Full Metro |
20.598 km |
01-11-2005 |
| |
|
U3 (Nollendorfplatz - Krumme
Lanke) |
Full Metro |
12.123 km |
01-11-2005 |
| |
|
U4 (Nollendorfplatz - Innsbrucker
Platz) |
Full Metro |
2.870 km |
01-11-2005 |
| |
|
U5 (Alexanderplatz - Hönow) |
Full Metro |
18.323 km |
01-11-2005 |
| |
|
U6 (Alt-Tegel - Alt-Mariendorf) |
Full Metro |
19.801 km |
01-11-2005 |
| |
|
U7 (Rathaus Spandau - Rudow) |
Full Metro |
31.832 km |
01-11-2005 |
| |
|
U8 (Wittenau - Hermannstr.) |
Full Metro |
18.056 km |
01-11-2005 |
| |
|
U9 (Osloer Str. - Rathaus
Steglitz) |
Full Metro |
12.506 km |
01-11-2005 |
|
| __-__-1902 |
ALEXANDRIA |
6 (El Nasr - Ramleh) |
Light Rail |
9 km |
11-04-2006 |
|